This trip was primarily to inspect the new water system, and meet with contractors.
The old spring-box next to the road, a little above the big old open tank was replaced with a new spring-box.
![]() |
new springbox top |
![]() |
new springbox top |
![]() |
new springbox outflow |
![]() |
new springbox inflow |
![]() |
gutter above spring |
![]() |
from above spring to big tank |
![]() |
Dave Clayton, contractor |
![]() |
staked-out pad |
Next way we met up with Mark and Rob, to finish the water line.
![]() |
Mark unloading his 'dozer |
![]() |
end of new water-line |
![]() |
Rob and Nathan on new water-tank |
![]() |
![]() |
patching the pipe |
![]() |
Rob, Nathan, Mark |
![]() |
![]() |
crossing the ravine |