<-
Previous
Up to index Image-info High-resolution Show Slider Zoom in:out Help
->
Next

new springbox outflow   2005/11/10.  3 of 16

Two new buried 2" pipes lead from the new spring-box: The higher flowlow pipe feeds the old tank. The lower pipe goes through a sediment filter to a new 3000-gallon tank on the hillside. That tank feeds to a filter lower down, and hence to the home-side.