This trip was primarily to inspect the new water system,
and meet with contractors.
The old spring-box next to the road, a little above the
big old open tank was replaced with a new spring-box.
 |
new springbox top |
 |
new springbox top |
 |
new springbox outflow |
 |
new springbox inflow |
 |
gutter above spring |
 |
from above spring to big tank |
 |
Dave Clayton, contractor |
 |
staked-out pad |
Next way we met up with Mark and Rob, to finish the water line.
 |
Mark unloading his 'dozer |
 |
end of new water-line |
 |
Rob and Nathan on new water-tank |
 |
(No caption) |
 |
patching the pipe |
 |
Rob, Nathan, Mark |
 |
(No caption) |
 |
crossing the ravine |