This trip was primarily to inspect the new water system, and meet with contractors.
The old spring-box next to the road, a little above the big old open tank was replaced with a new spring-box.
|
|
|
|
|
|
|
|
Next way we met up with Mark and Rob, to finish the water line.
|
|
|
|
|
|
|
|